The Phase 0 BAS Infrastructure Renewal Approach
Large BAS upgrades fail when teams discover dependencies halfway through. Banner Health maps everything first.
Brandon Conway (Sr. Manager, ROC, Banner Health) and Shawn Mathiesen (Construction and Engineering Senior Consultant, Banner Health) walk through the Phase 0 approach: documenting trunks, controllers, and dependencies across a campus before any work starts, then phasing upgrades around real budgets and clinical schedules. The method is vendor-agnostic and meant to be repeatable.
Watch the full recording and download the slides with Nexus Pro.
Recording
Slides
Recording
Slides
Recording
Slides
Large BAS upgrades fail when teams discover dependencies halfway through. Banner Health maps everything first.
Brandon Conway (Sr. Manager, ROC, Banner Health) and Shawn Mathiesen (Construction and Engineering Senior Consultant, Banner Health) walk through the Phase 0 approach: documenting trunks, controllers, and dependencies across a campus before any work starts, then phasing upgrades around real budgets and clinical schedules. The method is vendor-agnostic and meant to be repeatable.
Watch the full recording and download the slides with Nexus Pro.




This is a great piece!
I agree.